Application for Air ConditioningApplication for Air ConditioningĀ Body Corporate DetailsBody Corporate Name*Address* Street Address City State / Province / Region CTS NumberLot NumberUnit NumberApplicant DetailsApplicant Details*Please ChooseTenantOwnerOtherName* First Last Email* Phone*Type of Air Conditioning system*Please ChooseDucted EvaporativeDucted Refrigerated ChoiceWall Mount SplitWindow/Wall MountModel No.*Brand of Air Conditioning system*Inverter Type* Yes NoReverse Cycle* Yes NoKilowatt Rating*Decibel Rating*Number of External Units to be Approved for Installation*Time Frame for Installation*Name & Contact Details of Installer*Do You Currently have Air Conditioners?* Yes NoDetails of Current SystemIs the A/C unit located within the confines of the balcony?* Yes NoIf 'No', please specify locationWill the condenser be visible from other lots ?* Yes NoWill the Condenser be Visible from Common Property?* Yes NoSpecify location (Front of lot, side, rear)*Floor or Wall Mounted? Floor Mounted Wall MountedFixing Method*Method of Extracting Condensate*Any other details that may assist the Body Corporate Committee in considering your requestFile Upload: Supporting Documents (We recommend uploading pictures/diagrams/quotes to support your application)* Drop files here or Select filesAccepted file types: jpeg, jpg, png, doc, docx, pdf, , Max. file size: 25 MB, Max. files: 5. When considering your application the Body Corporate Committee will usually look to impose conditions on their approval. Below are a list of the standard list of conditions the Committee usually impose however, this is at their discretion and they may chose to amend these conditions as they see fit:The system is to be installed within the boundaries of the lot, not on common property;The system is to be professionally installed by a qualified and licensed contractor who holds adequate public liability insurance;The lot owner is to ensure any contractor engaged to complete the works follows the relevant safety requirements of the Work Health and Safety Act 2011 and its regulations; The lot owner accepts all responsibility for any potential loss, damage or injury caused as a result of the works;The lot owner absolves the body corporate of any potential claims against it as a result of the works;The works will not be funded in any way by the body corporate;The lot owner accepts responsibility for removal of all trade waste from site;The work is conducted during appropriate hours and in such a manner to reduce disturbance to other residents.The committee reserve the right to enter the lot (with their appropriate contractor or the building manager if required) and inspect the works at a reasonable time to ensure they are suitable and to ensure there is no risk to the building;The lot owner acknowledges and adheres to all relevant by-laws of the scheme;Any condensation emitted from the system is to be appropriately plumbed to ensure the waste water is disposed of responsibly. Specifically:a. condensation should not be permitted to drip onto any part of the lot or common property; andb. condensation should not be collected in any vessel that requires manual emptying on a periodic basis.Upon completion of the installation the lot owner is to provide photographic evidence to the committee demonstrating that the condensation will be disposed of responsibly;The lot owner acknowledges that the determination of whether condensation water is being disposed of responsibly is completely at the discretion of the committee;If it is determined by the committee that the installation is not disposing of the waste responsibly the lot owner agrees to make any adjustment to the installation as directed by the committee;The system is not to emit noise or vented air likely to unreasonably affect any surrounding lots or persons lawfully using common property; andIf directed by the committee to do so the lot owner must make any such adjustments to the installation to ensure it complies with the above listed conditions.Please Click:* I declare that the information provided is true and correct I have reviewed the Body Corporate By-laws and have addressed the relevant conditions of those By-Laws in this application I will abide by the Body Corporate Committees decision and conform to the conditions imposed by the Body Corporate By-laws and the Committee