Awning/Sail Application

Awning/Sail Application

  • Body Corporate Details

  • Applicant Details

  • Body Corporate & Applicant Details as per above plus:
  • Drop files here or
    Accepted file types: jpg, gif, png, pdf, Max. file size: 132 MB.
      We recommend uploading pictures, diagrams and/or quotes to support your application
    • When considering your application the Body Corporate Committee will usually look to impose conditions on their approval. Below are a list of the standard list of conditions the Committee usually impose however, this is at their discretion and they may choose to amend these conditions as they see fit. Standard conditions:
      • (a) The lot owner accepts all responsibility for any potential loss, damage or injury caused as a result of the works;
      • (b) The lot owner absolves the body corporate of any potential claims against it as a result of the works;
      • (c) The works will not be funded in any way by the body corporate;
      • (d) The lot owner must ensure the contractors used are suitably qualified, licenced and insured;
      • (e) The lot owner must obtain all necessary local government approvals;
      • (f) The lot owner accepts full responsibility to any damage to the building and it’s common areas as a result of the works;
      • (g) The works must be carried out in accordance with all relevant Australian Building Standards;
      • (h) The lot owner accepts responsibility for removal of all trade waste from site;
      • (i) The work is conducted during appropriate hours and in such a manner to reduce disturbance to other residents;
      • (j) The committee reserve the right to enter the lot (with their appropriate contractor or the building manager if required) and inspect the works at a reasonable time to ensure they are suitable and to ensure there is no risk to the building; and
      • (k) The lot owner acknowledges and adheres to all relevant by-laws of the scheme.